Milestones in the construction of the mechanical-biological stabilization plant (MBS)
Start of construction
17.05.2004
Laying of the foundation stone
22.06.2004
Bankruptcy of the general contractor
01.03.2005
Signature of contract with Herhof GmbH
20.09.2005
Signature of contract with WasteTec GmbH
21.09.2005
Pictures of the construction of the facilities
Hot commissioning
10.07.2006
Formal Opening
13.10.2006